Project info
This occupied remodel/expansion occurred during the winter months, the busiest production time of year for Western Pulp Products, requiring exceptional coordination with the Owner. This coordination was especially important when connecting the fire line to not compromise the safety of existing buildings and productivity of operations. This 27,000 sf storage facility included a fire life safety room, bathroom facilities, and future office space. The project also included a loading dock with a truck ramp and canopy. The Western Pulp building was constructed next to a railroad, which posed some challenges including disconnecting the rail road tracks to perform an open trench excavation to connect the main sewer line.